OUR SERVICES

SYSTEMDESIGNDRAWINGSBOQTENDER
HVACR-Load Analysis
-Overall Scheme
-Cost Estimate
-Audit Points
-CHW Schematics
-CW Schematics
-Electric Schematics
-Ref Piping Schematics
-AHU & P& I D
-Ducting
-Piping
-Plant Room Layouts
-AHU Room
-Cooling towers
-Major Equipments
AHU+
-Ducting + Insulation+Acc
-CHW Piping + Insulations+Acc
-CW Piping + Acc
-HVAC Electricals & Control schematics
-Tender Specifications
-Tender BOQ &
Estimates
-Special & General conditions of contract
-CAPEX BOQ
FIREStatutory compliance
Overall scheme
Cost estimate
Audit points
-Overall schematic
-Fire P&ID
-Control schematic
-UGTs with connections
-OHTs with connections
-External fire hydrant layout
-Internal fire piping layout
-Fire duct/ piping layout
-Sprinkler layout
-Pumps +Acc
-Piping + Acc
-Electricals
-Sensors
-Tender Specifications
-Tender BOQ &
-Estimates
-Special & General conditions of contract
-CAPEX BOQ
ELECTRICAL-Load Calculations
-Transformer sizing
-DG Set Sizing
-Earthing Calculations
-Lightening Protection calculations
-Switchgear and cable sizing
-Panel Designing
-UPS Sizing
-Budget Estimation
-Lux level calculation
-Lighting Design
-Raw/UPS Points finalization
-Audit Points
-Detailed SLDs
-HT layouts
-LT Room layouts
-Panel Drawings
-Internal cable/ Tray/ Bus duct drawing
-External cable/tray/bus duct drg
-Earthing layouts
-DG layouts
-UPS / battery layouts
-Capex equipments
-Tender BOQ
-Tender specs
-Tender drawings + BOQs
-Special & General conditions of contract
-CAPEX BOQ

WATER-Demand Analysis
-Water Quality Reports
-Storage analysis
-Drinking Water scheme
-Domestic Water scheme
-Raw water scheme
-Softner /DM/RO Design
-Pure water system
-Statutory compliance
-Overall water balance
-RWH Design
-Audit points
-UGT with connections
-OHT with connections
-Overall schematics
-Detailed schematics
-UGT/OHT/WTP /ZLD,STP layouts
-DM/RO/DW Layouts
-Water Piping layouts
-RWH/GW Discharge layouts
-Drain Layouts
-CAPEX Equipments
-Water Piping+ACC
-Drain Piping+ ACC
-RHW Piping + ACC
-Tender specs
-Tender drawings + BOQs
-Special & General conditions of contract
-CAPEX BOQ
IBMS-Operation Philosophy
-Design Basis report
-Cause & Effect Matrix
-Node count finalization
-Protocol Finalization
-Report Formats
-Trend Configuration
-All schematics drawings
-All layouts with related equipments locations
-Coordinated drawing for systems
-Capex ItemsBoq
-Tender BOQ
-Tender specs
-Tender drawings + BOQs
-Special & General conditions of contract
-CAPEX BOQ
ENERGY AUDIT SERVICES-Energy Audits
-Power quality Audits
-Safety Audits
-Adequacy Audits
-Validation Audits
-Route Cause Analysis
-Single line diagrams
-System schematics
-Layouts if required
-BOQ for recommendations if needed
NA
PROJECT EXECUTION-Design Management
-Cost Management
-Quality Management
-Change Management
-Risk Management
-Measurement and billing
-Documentation Control.
NANANA

We at RP Associates ‘Bring Together’ Our Skills, Our Expertise, Our Experience in Engineering, Costing, Manufacturing, Site Work, Management, Energy Modeling, Simulation Software, 3D CAD, Power quality Energy Audits - Results is Lowest Total Cost of Ownership!